An addition and renovation project of a 50’s era multi-level school. The school was brought up to current safety codes and handicap accessibility requirements. The new additions include the 7th grade wing, new lunchroom, and new kitchen. The existing lunchroom was converted to the 8th grade wing and the administrative offices were relocated to the new second level street entrance created. A covered walk joins the first floor and parent drop off point.