The design team selected a pre-engineered metal building structure for rapid construction of the “building shell” for the school’s exceptional large footprint. The layout provided state of the art technology and science labs, a “cafetorium” with full production theatrical stage, a gymnasium, and a large central commons area featuring the school’s mascot sculptured in brick.